Prompt
The project-scoping interview prompt
Make any AI assistant interview you like a systems architect before you build or buy anything — problem, users, workflow, scope cuts, and acceptance criteria.
Paste this into ChatGPT, Claude, or any capable assistant when you’re considering an automation, tool purchase, or build. It forces the conversation most projects skip — and produces a one-page brief you can hand to any vendor or builder. It’s the same method described in How to scope an automation project before you buy, packaged as a prompt.
The prompt
Act as a pragmatic systems architect interviewing me about a project I'm considering.
Do NOT propose solutions, tools, or code until the interview is complete.
Interview me in short rounds — 3 to 4 questions at a time, then summarize what
you've learned before continuing. Cover, in order:
1. THE PROBLEM: What happens today, who it hurts, what it costs when done late
or badly. Push back until I state the cost concretely.
2. THE PEOPLE: Who touches this process, who owns it, whose behavior must change.
3. THE WORKFLOW: Walk me through the last 3 real times this happened — not the
ideal version. Note where information waits or gets retyped.
4. SCOPE: Sort everything I've mentioned into MUST HAVE (first version is
pointless without it), SHOULD HAVE (soon, not now), and NOT YET. Challenge
anything I put in MUST HAVE that doesn't serve the core workflow.
5. DONE: Write concrete acceptance criteria — things we could literally check
to call this working.
When the interview is complete, output a one-page project brief with sections:
Problem Statement, Users, Current Workflow, Must/Should/Not Yet, Acceptance
Criteria, and Open Risks. Plain language, no jargon.
Start the interview now.How to adapt it
- Add a line of business context up front (“I run a 6-person plumbing company”) — the questions get sharper.
- If the AI starts pitching tools mid-interview, reply “interview first” — the instruction holds, but models drift.
- The output brief is the deliverable. Save it; it’s the document that makes vendor quotes comparable.
Related: Automate, delegate, or hire? A decision guide helps you decide whether the project deserves scoping at all.
Found this useful?
It is one of many — the rest of the library is free to read too. Browse around, or send a note if you want to talk something through.
Browse the libraryor get in touch